LOADING

Top 10 Most Related Posts
Best Review Based on Most Mentioned Phrase / Active User
Operating Condition The Debris Chute
Operating Condition The Debris Chute
3 times mentioned • Jesper Wee • 10 February 2020

Operating Condition The Debris Chute

References for the use pulling and discharging of the debris chute are permissible only to wind force 6 (inclusively), (connections of the debris pipes at the carrying frame). The operation attachments by couplers are to be attached immediately after reaching the final installation condition and be solved only directly before beginning of dismantling.

In the operating condition the debris chute may not hang on the hoist. The hoist serves only for pulling up and discharging when assembling and/or disassembly of the debris pipes.
Operating Condition The Debris Chute - Use Guidance Debris Chute
Use Guidance Debris Chute
10 times mentioned • Jesper Wee • 10 February 2020

Use Guidance Debris Chute

Structure and use guidance debris chute. In the operating condition the debris chute should be vertically arranged.

Turnings to 10:1 are exceptionally permissible, it also for the operating condition the support loads indicated for it are taken up after Board 1 and 2 by the building and/or scaffold and its anchorages. Into the debris chutes no parts may be thrown in, which are longer than the smallest diameter (400mm).
The Final Installation - Interior Design Success Based Upon
Interior Design Success Based Upon
5 times mentioned • Kim Yong Shan • 22 March 2016

Interior Design Success Based Upon

Urban Designs Studio We are a Malaysia-based commercial interior design and build firm dedicated to transform office interior spaces through ideas into your ideal working space. Our modern commercial and office interior design success is based upon our ability in refining meticulous details throughout custom commercial and office interior design and construction process.

We are also expert in residential interior design contractor and home furnishing and interior design. We excel in designing home interior spaces that magnifies your ideas and concepts. We attend clients with assistance in all phases of home interior design from initializing concepts, selecting home furnishings, fabrics and appliances, remodeling and new construction to the final installation.
The Final Installation - Designing Home Interior Spaces Magnifies
Designing Home Interior Spaces Magnifies
3 times mentioned • Kenny Chin • 28 October 2017

Designing Home Interior Spaces Magnifies

Urban Designs Studio. We are also expert in residential interior design contractor and home furnishing and interior design.

We excel in designing home interior spaces that magnifies your ideas and concepts. We attend clients with assistance in all phases of home interior design from initializing concepts, selecting home furnishings, fabrics and appliances, remodeling and new construction to the final installation.
The Debris Pipes - Use Guidance Debris Chute
Use Guidance Debris Chute
10 times mentioned • Shawn Paul • 10 February 2020

Use Guidance Debris Chute

Structure and use guidance debris chute. Constructional requirements.

Construction components. Debris chutes consist of hand which with support frames only for the assembly and disassembly of the debris pipes (the drop line coupled at the ground from single pipes pulls). For the debris chutes only original construction units may be used.
In The Operating Condition - Galvanized Steel Sheet
Galvanized Steel Sheet
5 times mentioned • Jesper Wee • 10 February 2020

Galvanized Steel Sheet

Entirely arrangement, generally the maximum height (overall length) of the debris chutes may amount to pipes from plastic 40m, pipes from galvanized steel sheet 30m, pipes from plastic or galvanized steel sheet at buildings or brick work 25m. The debris chutes are to be pulled vertically and attached in the operating condition vertically.

The construction units of debris chutes are limited for max. diagonal course with the up and dismantling as well as max. turning in the operating condition 10:1.
Carrying Frame - Use Guidance Debris Chute
Use Guidance Debris Chute
10 times mentioned • Shawn Paul • 10 February 2020

Use Guidance Debris Chute

Structure and use guidance debris chute. The scaffold brackets are to be fastened to the interior and external scaffolds. Mounting only at the interior and external scaffolds. Mounting only at the interior scaffolds is permissible, if the derivative of horizontal forces is guaranteed parallel to the scaffold level by other measures - e.g.

horizontal struts. Carrying frame. Scaffold bracket. Scaffold situation (floor).
Carrying Frame - Use Guidance Debris Chute
Use Guidance Debris Chute
10 times mentioned • Jesper Wee • 10 February 2020

Use Guidance Debris Chute

Structure and use guidance debris chute. Mounting at window attachment.

Window attachment consist of two carrying elements with 740mm distance. Support spindle, telescope arm, pin mapping, distribution of load (inside), distribution of load (outside), supports for carrying frame, coupling for carrying frame.
Carrying Frame - Use Guidance Debris Chute
Use Guidance Debris Chute
10 times mentioned • Jesper Wee • 10 February 2020

Use Guidance Debris Chute

Structure and use guidance debris chute. Constructional requirements. Construction components.

Debris chutes consist of cones blunt well behaved pipes from plastic or galvanized steel sheet with connections by chains, hooks and eyes. Carrying frame for hand winch and for debris tubing connection. Fastening takes place at window attachments or at scaffolds. Window attachments, which embrace force like the window breast and which take up carrying frame.
The Operating Condition - Concrete Boom Pump
Concrete Boom Pump
122 times mentioned • Micheal Leong • 18 May 2022

Concrete Boom Pump

Operators need to check the operating condition of each component strictly against our operating instructions before carrying out pumping operations. If you purchase the concrete pump form our company, we will offer you the operating instructions and our engineers will also help you train your operators.

If you need the concrete pumping machine, whether concrete mixer with pump, trailer pump or concrete boom pump, welcome to contact us now! We will reply you in one day!
Lastest Business