LOADING

Top 10 Most Related Posts
Best Review Based on Most Mentioned Phrase / Active User
The Top Rubbish Chute
The Top Rubbish Chute
3 times mentioned • Ck Lim • 14 October 2019

The Top Rubbish Chute

Red Rubbish Chute Funnel. Moulded from polyethylene, enables tipping direct from roof level.

Sits inside the top rubbish chute. 510mm (20”) top diameter. Weight: 10kg.
The Top Rubbish Chute - Universal Fixing Frame
Universal Fixing Frame
8 times mentioned • Ck Lim • 14 October 2019

Universal Fixing Frame

Universal Fixing Frame - Compatible with 500mm & 560mm Rubbish Chutes. Installation of the fixing frame.

The top rubbish chute is then connected to the short chains on the fixing frame. Other chutes follow below this and a top hopper can be slotted in the first connecting chute. The height of the top hopper can vary depending on the height the fixing frame is installed.
The Top Rubbish Chute - Universal Fixing Frame
Universal Fixing Frame
8 times mentioned • Perry Jim • 14 October 2019

Universal Fixing Frame

Universal Fixing Frame - Compatible with 500mm & 560mm Rubbish Chutes. This universal fixing frame is required to attach the top rubbish chute to the scaffolding on a building/construction site. Recommended to hold 10 chutes (100-150kg, including bracket weight).

Adjustable width to fit 20” & 22” chutes. Weight: 15kg. Black as standard.
Sits Inside The - Rubbish Chute Top Hopper Section
Rubbish Chute Top Hopper Section
3 times mentioned • Ck Lim • 14 October 2019

Rubbish Chute Top Hopper Section

Rubbish Chute Top Hopper Section. These 1m rubbish chutes are compatible with most systems supplies in the UK and Europe.

The top hopper sits inside the top and does not require any fittings. This section allows rubbish to be tipped directly from the roof level.
Sits Inside The - Serpent Bf Rda
Serpent Bf Rda
3 times mentioned • Carlo Qq • 12 June 2018

Serpent Bf Rda

The Wotofo Serpent BF RDA is a 22mm bottom fed two post, four terminal, RDA for use with Squonk devices. The Serpent BF RDA is built specifically for bottom feeding and features a gold plated BF pin, 6mm deep juice well, and a unique three piece construction in which the deck sits inside the cupped outer barrel.

The top cap features micro knurling for adjusting the side airflow and can utilize both 810 and 510 drip tips. The Serpent BF RDA features a condensed chamber and domed top cap for enhanced flavor delivery.
Roof Level - Chutes Used Between Floor Levels
Chutes Used Between Floor Levels
4 times mentioned • Perry Jim • 14 October 2019

Chutes Used Between Floor Levels

Standard Rubbish Chutes. Our standard rubbish chutes are used between floor levels to provide safe disposal of rubble and waste to ground level.

Top Hopper Rubbish Chutes. Our Top Hopper Chutes allow access to the chute system at the uppermost roof level. They feature a wide open top which acts extra protection when debris is being loaded.
Roof Level - Feature Wide Open Top
Feature Wide Open Top
6 times mentioned • Perry Jim • 14 October 2019

Feature Wide Open Top

Rubbish Chute-Top Hopper. Our Top Hopper Chutes allow access to the chute system at the uppermost roof level.

They feature a wide open top which acts extra protection when debris is being loaded. They are used in conjunction with a support frames.
Weight 10kg - Made High Quality Plastic
Made High Quality Plastic
5 times mentioned • Perry Jim • 14 October 2019

Made High Quality Plastic

Rubbish Chute Standard. The Standard Geda Ribbish Chute is made of high quality plastic with a 4mm wall, it is quick and easy to fix with a double hook mechanism.

The accessories also provide for a dust free option. Each section is 1.2m and weight 10kg.
Weight 10kg - Easily Assembled From 1m Sections
Easily Assembled From 1m Sections
3 times mentioned • Perry Jim • 14 October 2019

Easily Assembled From 1m Sections

Rubbish Chutes. A fast, effective and safe way to remove site debris. Quickly and easily assembled from 1m sections. Held together by chain and clips.

By adding a Y section, alternative levels below the hopper can have access to the chute. Chute Top Diameter = 0.56m, Weight = 9kg. Top Hopper Top Diameter = 0.56m, Weight = 10kg. Side Entry Top Diameter = 0.56m, Weight = 10kg.
Weight 10kg - Universal Fixing Frame
Universal Fixing Frame
8 times mentioned • Perry Jim • 14 October 2019

Universal Fixing Frame

Rubbish Chute Universal Fixing Frame. Rubbish Chute – Universal Fixing Frame Tailor-made, extremely safe method of connecting chute system to scaffolding.

510mm (20”) top diameter. Weight: 10kg.
Lastest Business